CHI Health Center Omaha is an arena and convention center in the central United States, located in the North Downtown neighborhood of Omaha, Nebraska. Operated by the Metropolitan Entertainment and Convention Authority (MECA), the 1,100,000-square-foot (102,000 m2) facility has an 18,975-seat arena, a 194,000 sq ft (18,000 m2) exhibition hall, and 62,000 sq ft (5,800 m2) of meeting space.
The complex opened sixteen years ago in 2003 as Qwest Center Omaha, and adopted the name of CenturyLink Center Omaha on July 15, 2011, as part of a $22 billion buyout of Qwest by CenturyLink (formerly CenturyTel). In July 2018, CHI Health bought the naming rights to the arena under a 20-year agreement worth $23.6 million, and the arena was renamed CHI Health Center Omaha effective September 1, 2018.
Just west of the Missouri River, the elevation at street level is approximately one thousand feet (300 m) above sea level.
The arena hosts basketball and hockey games, professional wrestling events, concerts, and the annual shareholders' meeting of Omaha-based conglomerate Berkshire Hathaway, usually held on the first Saturday of May.
The arena's primary tenant is the Creighton University men's basketball team. Through the 2014–15 NCAA ice hockey season, the Omaha Mavericks men's ice hockey team, representing the University of Nebraska Omaha, was also a primary tenant, but the Mavericks moved to the new Baxter Arena effective with the 2015–16 season.
In 2000, Omaha voters approved a $216 million bond issue to build a new convention center and arena; the remainder of the $291 million project was provided by private organizations and individuals. The facility design was led by architectural firm DLR Group. Naming rights to the arena were purchased by Qwest.
Qwest Center Omaha opened in September 2003 with an initial seating capacity of 17,000 for concerts, 15,500 for basketball, and 14,700 for hockey. In 2006, a $5.7-million expansion of the arena increased capacity by approximately 1,500 seats.
The Qwest Center displaced the 1954 Omaha Civic Auditorium as the city's premier indoor arena. The venerable Ak-Sar-Ben Coliseum closed in 2002 and was demolished in 2005.
The arena has hosted games in the NCAA Division I Men's Basketball Tournament four times: first- and second-round games in 2008, 2012, and 2015; and Midwest Regional games (Sweet Sixteen and Elite Eight) in 2018. The arena also hosted the 2010 NCAA Division I Wrestling Championships, and was home to the WWE Judgment Day 2008 pay-per-view, as well as other events from WWE.
The center hosted the nationally televised USA Swimming Summer Olympics trials in 2008, 2012 and 2016. The center does not have permanent swimming facilities and a team of 200 workers with oversight by Myrtha Pools constructed them in two weeks. (which specializes in the construction and dismantling of large scale temporary pools). The Omaha Fire Department pumped in two million gallons of water from hydrants around the center.
The 2008 event averaged more than 12,000 spectators each night.
A storm damaged a portion of the roof known as The Hat on June 27, 2008. There was no structural damage, but the damage caused water to pour into parts of the Qwest Center, flowed down two sets of arena steps and onto the deck of the competition pool for the USA Swimming Summer Olympic Trials. The schedule for the trials went on as planned.
The pools were dismantled after the event and moved to other cities for permanent installation with the 2008 pool going to the Poseidon Swimming facility in Richmond, Virginia, the 2012 pool going to Charles River Aquatics in Boston, Massachusetts and the 2016 pool going to the Hulbert Aquatic Facility in West Fargo, North Dakota (West Fargo bought the pool via a local group of swim enthusiasts called UP Aquatics for $900,000).
In 2016, the arena hosted the Kellogg's Tour of Gymnastics Champions.
In 2001, construction began on the new convention center and arena, known as the "Omaha Arena and Convention Center". Architectural firm DLR Group spearheaded the design, while The Thornton-Tomasetti Group served as structural engineer. M–E Engineers, Inc. was the services engineer and a local company, Kiewit Corporation, led general construction. A groundbreaking ceremony was held on March 1, 2001. The venue was completed in August 2003, with an official opening on September 24, 2003.
In 2006, the MCEA funded a project to expanded the arena and add an additional 1,472 seats to the upper bowl. The project also included adding restroom facilities and concession stands, as well as updating aesthetics, mechanical systems, and emergency exits. The cost of the project was $6 million. Construction began in May and was completed September 8, 2006.
In 2009, the center saw another renovation with work enveloping the entire building. The $6 million project included new carpet, wallpaper, reupholstered arena seating, and a new scoreboard.
The convention center has placed Omaha on the convention map since opening in 2003. The center features three exhibit halls, four ballrooms and over 15 meeting rooms.
The arena is the busiest venue of the complex. Built in 2001, the arena was meant to replace the aging Omaha Civic Auditorium and demolished Ak-Sar-Ben Coliseum. It is the largest arena in the state, seating over 18,000. It contains 32 luxury suites and over a thousand club seats. The arena hosts shows of all genres, including: concerts, family shows, sports, rodeos and circuses. The arena opened September 12, 2003, with a private concert by Grand Funk Railroad. The first official event was the "River City Roundup Fair and Festival", held at both facilities.
This hotel features 600 guest rooms, 15 meeting rooms, and two ballrooms, an on-site restaurant, and skywalk connection to the convention center. The $71 million property opened April 2004 and has achieved the AAA four-diamond rating for ten years.
Complete article available at this page.
This post have 0 komentar
EmoticonEmoticon