Constitution Center (formerly known as the David Nassif Building) is an office building located at 400 7th Street SW in Washington, D.C. It is 140 feet (43 m) high and has 10 floors. Covering an entire city block, it is the largest privately owned office building in the District of Columbia. Current tenants include the Federal Housing Finance Agency and the Office of the Comptroller of the Currency. As of February 2014, Constitution Center was worth $725.8 million, making it the most valuable, taxable property in the city.

In the 1950s, the U.S. Congress, then the governing institution of the District of Columbia, undertook the Southwest D.C. urban renewal project, the first in the capital district and one of the earliest such programs in the nation. In 1946, Congress passed the District of Columbia Redevelopment Act, which established the District of Columbia Redevelopment Land Agency (RLA) and provided legal authority to clear land and funds to spur redevelopment in the capital. Congress also gave the National Capital Planning Commission (NCPC) the authority to designate which land would be redeveloped, and how. The RLA was not funded, however, until passage of the Housing Act of 1949. A 1950 study by the NCPC found that the small Southwest quarter of the city suffered from high concentrations of old and poorly maintained buildings, overcrowding, and threats to public health (such as lack of running indoor water, sewage systems, electricity, central heating, and indoor toilets). Competing visions for the redevelopment ranged from renovation to wholesale leveling of neighborhoods, but the latter view prevailed as more likely to qualify for federal funding. Original plans called for the demolition of almost all structures in Southwest Washington beginning in 1950, but legal challenges led to piecemeal razing of the area until the mid-1950s.

Issues surrounding the planning and construction of L'Enfant Plaza (immediately to the west of the site) delayed construction of any buildings on the block until the late 1960s. In 1963, the RLA purchased the land from the Westminster Memorial Church, Fifth Baptist Church, and homeowners. The United States Department of Health, Education and Welfare wished to purchase the site for its new headquarters, but the RLA declined to sell the property. (The federal government does not pay taxes on land and structures it owns, and the RLA wanted a private owner who would add to the tax base.) The RLA attempted to sell the land on January 29, 1965, but there were no buyers.


The building was constructed pursuant to an agreement between the General Services Administration (GSA) and Boston developer David Nassif, Sr. In July 1965, President Lyndon B. Johnson began planning to unite various disparate transportation agencies into a new United States Department of Transportation. GSA (the property owner and manager for the U.S. federal government) began seeking to lease or build a structure to house the new agency in late 1965. Donald T. Kirwan, chief of GSA's leasing division, knew Nassif from a previous lease negotiation, and discussed with him the siting of a building and its size. Nassif approached the RLA on April 21, 1966, and asked to buy the newly razed block of land bounded by 6th, 7th, D, and E Streets SW. In May 1967, GSA sent a letter to Nassif advising him that it was likely to lease the entire structure he intended to build. The $5.9 million land purchase was finalized on October 30, 1967. The cost of the structure is unclear. On November 15, 1967, Nassif had secured a $39 million construction loan. But The Washington Post pegged the cost of the building at $27 million in July 1968. The newspaper said in August 1970 that the cost of the structure was $26.5 million. The building was designed by architect Edward Durrell Stone, who also designed the John F. Kennedy Center for the Performing Arts. On April 11, 1968, GSA leased the entire building from Nassif for 20 years for $98 million.John A. Volpe Construction was the chief contractor.

Construction began in July 1968 (although it was delayed for a very short time when unionized ironworkers at the site went on strike) and was completed in 1969. The main entrance faced 7th Street SW. It included a central courtyard (open to the sky) which featured a fountain, footpaths, benches, and landscaping. Four 15-foot (4.6 m) high arcades pierced the building in the center of the block on each side, creating access to the courtyard. The facade's vertical marble ribs were obtained from the same quarry near Carrara, Italy, that provided the marble for the Kennedy Center. The finished building had 10 floors, three basement floors, overhanging eaves, and 2,500,000 square feet (230,000 m2) of space (1,019,000 square feet (94,700 m2) of usable space). It was the largest privately owned office building in the city at the time.

Kirwan's contacts with Nassif later became the subject of a legal investigation. Kirwan not only shared inside information with Nassif about leasing plans of the GSA, he later invested in Nassif's D.C. business and became an officer in it. This relationship (Kirwan left GSA in December 1966, before the letter indicating intention to lease was set to Nassif), and GSA's irregular leasing of the building, became public knowledge in August 1970. An internal GSA audit was critical of the leasing process and the costs of the lease.

That same month, refinancing of the building was called into question. In the U.S., it is common business practice for the initial lender to provide an interim loan (the "construction loan") to build a building. The interim loan is then paid off by a second lender, who becomes the mortgage lender and receives payments from the building's owner. Riggs Bank, a local D.C. bank, had provided the interim construction loan to Nassif. The New York City Employees Retirement System was to have paid off this construction loan. That payment was halted when the loan officer Nassif had dealt with was indicted for taking bribes to approve loans. When the pension fund refused to provide the loan, Riggs Bank sued for payment and threatened to foreclose on the Nassif Building.

From 1969 until 2007, the Nassif Building served as the headquarters of the U.S. Department of Transportation (DOT). The building was designed to have removable interior walls to permit easy reconfiguration of the interior space. In November 1970, the federal government exercised its powers of eminent domain and seized control of the three-story basement parking garage from Nasif in order to provide inexpensive parking for DOT workers. Over the years, so many government workers complained of ailments while working in the structure that some believed it suffered from sick building syndrome. David Nassif Associates, owner of the building, disputed these claims. However, when the Department of Transportation announced it would leave the building in 2000, the owners promised a $100 million renovation that included a new air ventilation and cleaning system as an inducement for the agency to stay. The owners also unsuccessfully sued the General Services Administration in 1999 to force it to renew the federal lease on the building. The Department of Transportation completed their move out of the Nassif Building and into their new headquarters in June 2007.

The L'Enfant Plaza Metro station opened an escalator entrance in the structure's north arcade on July 1, 1977. The entrance was one of two which opened that day (Metro Blue Line's opening day). The third entrance (inside the L'Enfant Promenade underground shopping center at L'Enfant Plaza) opened in October 1977. In June 1992, Virginia Railway Express opened the $1.1 million VRE L'Enfant Station on Virginia Avenue SE (about a half block north of Constitution Center).

In 2006, Nassif Associates announced a $220 million renovation of the building and renamed it "Constitution Center".SmithGroup was the architectural firm overseeing the redesign, and Davis Construction oversaw the construction.

The renovation included some of the highest security features of any building in the D.C. area. They included a central and perimeter security system; closing of the central plaza of the building, which, along with other changes, increased its interior footage by 80,000 square feet (7,400 m2); steel-jacketed underground parking garage columns capable of withstanding a powerful explosion; six fully staffed security screening points; concrete blockades built into the façade; communication, potable water, and utilities contained in blast-proof spaces; ventilation shafts for the parking garage in a secure area; and special security procedures to obtain access to the building's critical systems. The security enhancements made the office building suitable for all federal agencies with the exception of the United States Department of Defense. The 700,000-square-foot (65,000 m2) underground parking garage contains 1,500 spaces.

Several amenities were also added to the building. These included a 10,000-square-foot (930 m2), 400-seat auditorium on the courtyard/plaza level; a six-room, 11,000 square feet (1,000 m2) conference center which can accommodate meetings of 10 to 500 people; a full-service cafeteria on the plaza level, with access to the courtyard; and a fitness center for 100 people.

The exterior of the building was also radically changed. The celebrated key visual feature of the building, its exterior vertical white marble ribbing, was completely removed after it was found to be bowed from age and weather. Although this fundamentally changed the nature of Durrell's building, there was almost no public outcry. It was replaced by an energy-efficient, all-glass facade. Perhaps the most significant renovation feature was the structure's use of a chilled beam HVAC system, which uses chilled or heated water circulated in strategically placed columns in the interior space to cool and warm the building. To test the efficiency of the chilled beam technology, the system was installed in the penthouse of the building and tested for a full year. The architect agreed to use the system after the test outperformed specifications. The installation represented the first large-scale use of the chilled beam technology in the United States. Other energy-saving enhancements included motion and daylight detectors to turn lights off when not needed, and special exterior windows which automatically dim to prevent daytime heating. The building's ventilation system was also upgraded. The renovation left the structure with 1,400,000 square feet (130,000 m2) of interior space. The final cost of the renovation was pegged at $250 million.

Some aesthetic improvements were made as well. The building now features a 1 acre (0.40 ha) park in its open-to-the-sky central courtyard. Most of the courtyard's concrete was removed and trees, shrubs, and flowers planted to absorb rainwater. The park, which is now no longer accessible by the public, also includes a very large granite abstract art sculpture ("Legacy") by Richard Deutsch. The sculpture is meant to reflect the original facade of the building by Edward Durrell Stone as well as the memory of David Nassif, Sr. and his son, David Nassif, Jr. The L'Enfant Plaza Metro station still has an entrance under the building on D Street SW (although this entrance closed between October 2007 and July 2008 for the building's reconstruction). The renovation installed artwork by internationally-known artist Stephen Knapp near this entrance, in which strong beams of light are passed through dyed glass to splay brightly colored patterns on the ceiling. The light sculpture, titled "Transformation", symbolizes the building's renovation and rebirth.

The Constitution Center is registered with the Green Building Council for Gold LEED Certification.

The renovated Constitution Center won two awards. The Mid-Atlantic Construction construction news Web site gave the building its "Project of the Year – Renovation/Restoration" accolade in December 2010. On March 25, 2011, the Washington Building Congress bestowed its 2011 WBC Craftsmanship Award on J.E. Richards, Inc. for excellence in workmanship in installing the power generation, distribution, and switchgear at Constitution Center.

In January 2011, Constitution Center was valued at $446 million by city tax assessors, making it the third most valuable private property in the city that year.

The late-2000s recession left the renovated building struggling to find tenants. It was empty for nearly two years after it was opened for occupancy in April 2009. Both the United States Department of Homeland Security and NASA explored leasing all or part of it in 2009 and 2010, but chose not to do so. In August 2010, the United States Securities and Exchange Commission (SEC) signed a letter contract for 900,000 square feet (84,000 m2) of space at Constitution Center. The SEC planned to take occupancy in September 2011. In January 2011, the Office of the Comptroller of the Currency agreed to lease 640,000 square feet (59,000 m2) of space and the Federal Housing Finance Agency signed an agreement to occupy 335,000 square feet (31,100 m2) of space. The Office of the Comptroller and the Federal Housing Finance Agency both occupied the building by March 2012.

The SEC's occupancy of the building did not occur as planned. In October 2010, the SEC informed Nassif Associates that it needed only 340,000 square feet (32,000 m2) of the 900,000 square feet (84,000 m2) it had leased. On January 20, 2011, the SEC's inspector general launched an investigation into whether the SEC leased was proper and legal. SEC chairman Mary Schapiro was strongly criticized by Republicans in the United States House of Representatives for her handling of the lease, which she had personally approved. By May, it was unclear if the SEC would occupy any space at all in the building. On May 23, the SEC inspector general requested a formal opinion by the Comptroller General of the United States as to whether the lease violated the Antideficiency Act. The inspector general said SEC "grossly overestimated the amount of space needed at SEC Headquarters for the SEC's projected expansion by more than 300 percent and used these groundless and unsupportable figures to justify the SEC committing to an expenditure of $556.8 million over 10 years".

Constitution Center (Washington, D.C.) 1

Constitution Center (Washington, D.C.) 2

Constitution Center (Washington, D.C.) 3

Constitution Center (Washington, D.C.) 4

Constitution Center (Washington, D.C.) 5

Complete article available at this page.

your advertise here

This post have 0 komentar


EmoticonEmoticon

Next article Next Post
Previous article Previous Post

Advertisement

Themeindie.com